Concrete sidewalk building in Riverside CA - a walk that sits flat and sheds rain

Old walk cracked, sunk or catching toes? We dig it out, pack a firm base and pour a new concrete sidewalk that sits flat.

Concrete sidewalk leads from a stone-front house through a landscaped garden, with black railings beside the entrance steps.
  • Licensed and insured.
  • Free estimates at your property.
  • Replies within 1 business day.

What goes into building a new concrete sidewalk in Riverside?

Concrete sidewalk building in Riverside, CA means digging out the old walk or dirt path, packing a firm base, then forming, pouring and finishing a new walk, so you get a flat, solid way from the driveway or street to your door.

Most calls start with a walk that's cracked, sunk at one end or lifted into a trip edge, or with a dirt path that turns to mud every time the sprinklers run. The price moves with the walk's length and width, how much old concrete has to come out, how much digging the ground needs and whether a stretch has to carry a car or mower. The schedule turns mostly on the weather on pour day and the first week while the concrete hardens. I come out and leave a written estimate that spells out what's in it, so you see your own number before anything's decided. A walk counts as flatwork, the flat pours like walks, patios and driveways, and the concrete contractor class from the state contractors license board covers that work, so it's fair to ask anyone you're thinking of hiring about their license. We're licensed and insured, based in Riverside, and we work in many of the cities around it in Riverside and San Bernardino counties. If yours isn't listed, call and ask.

How we handle concrete sidewalk building

We start by marking the line of the walk and digging out the old concrete and loose dirt down to firm subgrade, the ground the walk actually sits on, then we spread gravel and pack it hard so the walk doesn't settle with the dirt over the years. That base is the part nobody sees once we pour, and it's the first thing people want to trim to save money, but I'd rather put the money there than into a fancy top, because a nice finish on a loose base still cracks and sinks. We set the forms with a slight tilt across the walk so rain runs off instead of pooling or heading toward the house, then pour and give it a broom finish, the light ridged texture that keeps feet from slipping when it's wet. After that we cut control joints, shallow grooves across the walk, so when the concrete shrinks and cracks it does it along those lines instead of wherever it wants. If a car or mower will ever roll across the walk, show us where before we pour so that stretch gets built heavier, and we'll go over when you can walk on it and when it's ready for a loaded wheelbarrow.

A new walk often ties into other work around the house. If it runs up to a garage with a cracked or uneven floor, it can make sense to look at garage floor concrete on the same visit, and if you'd like color, a pattern or a border on the walk itself, that's decorative concrete.

  • Plain broom-finish walk

    This suits most front and side walks, because the broom texture grips in the rain and it's the simplest finish to keep clean. It also keeps your spending on the base, where it does the most good.

  • Walk with a heavier crossing

    This suits a walk that a car, trailer or riding mower has to cross to reach a side yard or back gate. We build just that stretch heavier, so you're not paying to beef up the whole walk.

If your old walk has lifted into a trip edge or water is pooling against the house, call (951) 589-3080 now instead of waiting for it to get worse.

What happens when you call us about a new sidewalk in Riverside?

Here's how a sidewalk job runs with us, from your first call to walking the finished concrete together. I do the estimate myself and run the crew on the job, so you deal with the same person throughout.

  1. Call or send the form

    You call (951) 589-3080 or fill out the form, and we get back to you to set a time for me to come see the walk. Evenings and weekends work too, since we're open seven days.

  2. I look at the site

    I check the ground and the slope and ask how you'll use the walk, including any spot a car or mower will cross. You get a written estimate that says what's in it, so there's no guessing what you're paying for.

  3. We prep, form and pour

    Once you say go, we settle the permit question, dig out and pack the base, set the forms and pour. Keep kids and pets back on pour day, because wet concrete is caustic and can cause deep burns after about 2 hours on skin.

  4. We walk the finished job

    When the forms come off, we walk the new sidewalk together so you can see the finish and the joints and ask anything you want. Satisfaction guaranteed on every job.

Get a free written estimate for your new sidewalk

We reply within one business day to set a time, then I come out, look at the walk and leave a written estimate at your property, free and with no obligation.

(951) 589-3080

Concrete sidewalk building in Riverside's summer heat

Heat is the biggest thing that shapes a sidewalk schedule here. Hot-weather trouble can show up any time of year but mostly comes in summer, and a sunny, windy day is harder on fresh concrete than a calm, humid one at the same temperature, because the top dries out before it can be finished and can end up weak and dusty. We start pours early in the day, and when the forecast is hot and windy we'll talk with you about moving the date, since industry guidance on hot weather puts postponing first and waiting is often better than repairing or replacing a bad pour. If your walk connects to the public sidewalk along the street, bring it up, because we check what the city wants before we start, and when a permit is needed we pull it ourselves or help you apply.

Around Riverside and on jobs in Jurupa Valley and Moreno Valley, most sidewalk calls are about older walks that have cracked, sunk or lifted, or side yards that never had a real walk at all, and we build them the same way wherever we go.

Sidewalk questions we hear from Riverside homeowners

How much does a new concrete sidewalk cost in Riverside?

There's no single price, because it comes down to the size of the walk and the shape the ground is in. Tearing out and hauling off old concrete and digging soft ground add to it, a heavier stretch for a car or mower adds a bit more, and color or pattern costs more than a plain broom finish. The written estimate I leave after the visit puts your number on paper.

How thick should a concrete sidewalk be for a house?

Common guide practice puts a home walk at about 4 inches thick, and 5 to 6 inches where a vehicle will cross it, such as a path into a side yard. That's the heavier stretch I ask you to point out before the pour, so the extra thickness goes right where the weight will be.

How long does a new sidewalk need to cure before I can walk on it?

You can walk on it lightly after 24 to 48 hours and use it normally after 48 to 72 hours. Hold off on heavy loads like a loaded wheelbarrow for 7 days while it cures, the slow hardening that builds its strength, so plan yard work and deliveries around that first week.

What goes under a concrete sidewalk to keep it from sinking?

A layer of packed gravel over firm, dug-out ground. Guides call for about 2 inches of gravel where the soil drains well and about 4 inches in clay or soil that holds water, and I check which one you've got when I come out.

What causes a new concrete sidewalk to crack?

Concrete shrinks as it dries, so it can crack even when the job's done right, and I'd rather tell you that now than have it surprise you later. What we control is where it cracks and whether the walk stays flat, which is why we put the money into the base and cut the joints that give cracks a straight line to follow.

When should I seal a new concrete sidewalk?

Wait at least 28 days after the pour. One concrete supplier advises sealing only after the concrete has cured that long, to help it keep its look and hold up, so treat sealing as a separate job about a month later.

  • If your new walk ends at a garage with a cracked, pitted or uneven floor, a fresh slab inside finishes the path from car to door.

  • If plain gray isn't what you pictured, color, stamped patterns or a contrasting border can make the walk match your patio, steps or the front of the house.

Put your new sidewalk on the calendar

Call (951) 589-3080 or send the form with the walk's rough length, any spot a car or mower will cross and the timing you want, so I show up ready to talk about your job.